You must know this! Powergrid plans to install ~65,000 circuit km (ckm) of transmission lines during the 12th Plan, nearly twice the likely installation in the 11th Plan (~30,000ckm, target of 37,000ckm) with a targeted capex INR1t , ~2x the 11th Plan capex says Motilal Oswal report http://bit.ly/s5n7zW