Q.
Bharat heavy Electricals Ltd vission, mission, objectives
Asked by santosh kr singh,
15 Nov '09 04:40 pm
Earn 10 points for answering
Answers (3)
1.
Report abuse
Useful
(0)
Not Useful
(0)
Your vote on this answer has already been received
2.
These r policy statements,,,, available internally only
Answered by dhanendra kumar jain, 15 Nov '09 04:46 pm
Report abuse
Useful
(0)
Not Useful
(0)
Your vote on this answer has already been received
3.
BHEL has
Installed equipment for over 90,000 MW of power generation -- for Utilities, Captive and Industrial users.
Supplied over 2,25,000 MVA transformer capacity and other equipment operating in Transmission & Distribution network up to 400 kV (AC & DC).
Supplied over 25,000 Motors with Drive Control System to Power projects, Petrochemicals, Refineries, Steel, Aluminum, Fertilizer, Cement plants, etc. ...more
Answered by saranathan Narasimhan, 15 Nov '09 04:44 pm
Installed equipment for over 90,000 MW of power generation -- for Utilities, Captive and Industrial users.
Supplied over 2,25,000 MVA transformer capacity and other equipment operating in Transmission & Distribution network up to 400 kV (AC & DC).
Supplied over 25,000 Motors with Drive Control System to Power projects, Petrochemicals, Refineries, Steel, Aluminum, Fertilizer, Cement plants, etc. ...more
Report abuse
Useful
(0)
Not Useful
(0)
Your vote on this answer has already been received